Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the acf domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/jagahonline/public_html/blog/wp-includes/functions.php on line 6121
Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the masterslider domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/jagahonline/public_html/blog/wp-includes/functions.php on line 6121
Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the better-studio domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/jagahonline/public_html/blog/wp-includes/functions.php on line 6121
Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wordpress-seo domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/jagahonline/public_html/blog/wp-includes/functions.php on line 6121
Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the publisher domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/jagahonline/public_html/blog/wp-includes/functions.php on line 6121 Bara River Water Supply Scheme to Be Revived by KPK Government
Peshawar: The Khyber Pakhtunkhwa (KP) Government has announced a plan for the rehabilitation of the Bara River Water Supply Scheme. The announcement was reported after the meeting of the Public Health Engineering Department and Line Department.
As per the public details, the participants at the sessions also constituted a committee consisting of four-members that would draft a preliminary study and feasibility plan for the now defunct Bara River Water Supply Scheme. The Public Health Engineering Department and the Line Department will work in close collaboration on the afore-mentioned project.
Earlier, Shah Farman, the KP Governor, directed the concerned officials to address the issue of the river contamination and decreasing water levels in Peshawar. The governor in an official statement has highlighted the importance of the water supply scheme. The initiative is said to be cost-effective since the project will not require excessive use of tube-wells or any other kind of water-pulling equipment.